Jackup and platform drilling and completion systems. Pv drilling i is a kfels mod v b class jackup capable of operating in water depths up to 300 feet. Pdf seabed morphology mapping for jackup drilling rig. Often a much shorter and lighter collar is used, and the rigs have pulldown chains to utilize part of the rigs weight at shallow depths.
Ntl 2009g10 guidelines for jackup drilling rig fitness. It is also capable of operating in water depths of up to 400 feet, capable of. Jackup drilling rig perisai s first jackup drilling rigis a ppl pacific class 400 with technologically advanced drilling capabilities. After rig maintenance in azerbaijan, saturn is currently under contract with petronas in the turkmen sector of the caspian sea. Top drive novtds8sa, 3,450 hp national drawworks novads10t automated drawworks system, vfd, 14p220 mud pumps, amphion drilling system are used to obtain maximum drilling depth up to 25,000 feet. Premium jackups defined as rigs built after 2000, earlier built rigs defined as standard jackups 2. Spartan rig 303 8751825 drilling jack up 8751825 spartan rig 303 click to view larger image. Space restrictions under the cantilever prevented the use of other weighing systems without costly rework to the load structure. The term jackup covers a large variety of offshore structures from small liftboat. A modu drills down into the ocean floor until it finds oil deposits. A jackup rig or a selfelevating unit is a type of mobile platform that consists of a buoyant hull fitted with a number of movable legs, capable of raising its hull over the surface of the sea. Discover one of the youngest and most advanced fleets in the industry. An introduction to offshore drilling and jackup rigs.
How jackup drilling rig is moved from one location to another animation video with footage from real life operation. Pdf foundation performance of offshore jackup drilling rigs. A common grouping system for marine rigs is based on the bottom support of the rig on the. Seven out of nine rigs have drilling packages from cameron a schlumberger company. Drilling rigs used offshore are termed marine rigs.
Our modern fleet operates globally and includes the largest harsh environment jackup rigs in the world, as well as advanced deepwater drillships and deepwater semisubmersible rigs. Wet tows are the most common method of inter field rig moves of a jack up drilling unit and are by far the most practical, even over relatively long distances. Cantilever allowable drillingworkover loads indicated are the sum of setback, hook, rotary, and conductor tension loads in kips based on the cantilever assembly weight and center of gravity any increase in cantilever assembly weight will result in a decrease in the super m2 selfelevating drilling unit allowable drillingworkover loads. The mobile offshore jackup rig is a selfelevating platform, consisting of a hull for drilling operation, with retractable legs passing through the hull 1, 2. The following safety tips should be observed when rigging up down a drilling rig. The riser allows drilling fluids to pass from the ocean floor to the rig. General ocean tow recommendations for jack drilling units, iadc, february 1991. An offshore drilling rig has to create the same working. Drilling vessel description designed and constructed by bethlehem steel corporation 1974 completely remanufactured as. Document number dt163 file identification dt163 rev 00 hydraulic drilling rig hh75 jack up 00 260620 technical proposal cog arm fes. Shelf drilling is the worlds largest jackup contractor company overview key milestones fleet size 39 shallow water drilling rigs 38 ilc jackups and 1 swamp barge nov shelf drillings initial fleet acquisition 2012 dec operating independence 20 may 10 rigyears contract with chevron for 2 newbuilds 2014. Davie quebec canada by davie shipbuilding limited, quebec, canada, in vicksburg design. Perisais first jackup drilling rig is a ppl pacific class 400 with technologically advanced drilling capabilities.
Platform rig mode completely autonomous from the jack up. Providing a very stable drilling environment, in comparison to other types of offshore drilling rigs, jackups can drill in waters up to 350 feet deep. A typical modern drilling jack up is capable of working in harsh environments wave heights up to 80 ft, wind speeds in excess of 100 knots in water depths up to 500 feet. In october 2018, martin bencher uae, and our offices in singapore and vietnam completed the transportation of a jack up drilling rig from vietnam to.
The first one is the rig atlantic 7 which is abs certified 2019 and ready to work. Ultrapremium jackups are fit for deep shelf drilling iadc. Technical documentation front sheet page 1 of 16 document title hydraulic drilling rig hh75 jack up package description hydraulic drilling rig hh75 mounted on jack up, hpu diesel driven, rig instrumentation, optional equipment. Jackup rig solutions through a seamless turnkey approach, tsc builds complete jackup rigs and provides a complete cantilever and drill floor package which includes the cantilever and drill floor structure, drilling equipment, cranes, solids control system, power package, rig control and drive package, bop stack and handling and pipe handling. Updated each friday, the weekly rig count provides accurate offshore drilling rig data by major region and globally. Our fleet of 15 jackups has experience in numerous offshore locations worldwide and is continuously upgraded and modified to accommodate our clients needs.
Outline of specification for 400ft jack up rig cp400 1 general provisions 1. The cantilever assembly with drill floor and pipe rack is also capable of skid off operation. A jackup drilling rig is an example of a mobile offshore drilling unit modu. Lewco model l495 driven by 1 oem 1,150 hp ac motor cementing equipment. The rig is designed and equipped to drill high pressure and high temperature wells as deep as 30,000 feet. Our team of global analysts compiles oil rig data daily through direct contact with rig owners and offshore operators to derive dependable figures. After all the wells are drilled, the rig and quarters are removed from the platform. Petrobel offshore egypt next up was a sixmonth contract extension in nigerian waters. Once the rig move planning has been carried out, a prejob meeting with all involved should be held. Every jackup rig cantilever and drill floor needs to be accurately weighed after construction. A new class of jackup offshore drilling rigs is evolving to meet increas ingly demanding drilling conditions on continental shelves around the world.
Lewco model ldw 3000 hd driven by 2 1,500 hp ac motors rotary. During a wet tow, a jackup is moved between locations in floating mode with the legs up and assisted by one more towing vessels. Smaller platforms use a jackup rig to drill the wells. The rig count tables below include all jackups, semisubmersibles, and drillships. Gsf constellation ii 8765383 drilling jack up 8765383 gsf constellation ii click to view larger image. When positioned over the drilling site, the bottoms of the legs rest on the seafloor. Each component of the system has been designed for high reliability and fieldproven performance. Jackup drilling rig definition oilfield glossary oil. A mobile bottomsupported offshore drilling structure with columnar or opentruss legs that support the deck and hull. Maersk drilling has been an innovator in jackup drilling for more than 40 years and holds a leading position in the highefficiency segment.
A jackup rig is typically used at a dozen or more sites during its service life. The riser is the part of the drill that goes down below the deck and through the water. The rig is equipped with a precise hydraulic cylinder hoisting system and incorporates a maximum level of automation for pipe handling and racking as well as rig floor processes. Instead, a hydraulic motor that travels up and down the mast supplies torque directly to the drill pipe. Shelf drilling lists early 2019 jackup rig assignments. The derrick, or mast, on a jackup may be located over a drilling slot indented. It can therefore be expected to encounter a range of water depths, environmental load conditions and soil types. As a consequence, the ratio between drilling costs and petroleum revenue has risen dramatically. Moller maersk exits egyptian drilling company joint venture. The following safety tips should be observed when rigging updown a drilling rig. The jackup rig is available with hook loads of 250 up. Jack up rig atlantic 7 exensco 69 and jack up pacific 12 expride wisconsin direct owners are authorized us to find a serious buyers for these units. Lift and weigh of a jackup rig cantilever and drill floor,lamprell has completed the fabrication of a new jackup drilling rig.
Although smaller in size than a large conventional rotary table rig, top head drives are capable of. International association of drilling contractors iadc website. Dubai, uae shelf drilling has issued an update of firstquarter awards for its offshore rig fleet in january, the company secured a threeyear contract offshore india from ongc for the jackup ron tappmeyer, and a oneyear contract for the jackup trident 16 with belayim petroleum co. Drilling rigs on land are extremely simple but, because a jackup has to be mobile and seagoing, it needs facilities to generate its own power and water, and house the inhabitants that keep it running. The rig is positioned over preset wellheads by jacking across on skid beams. The neptune jackup rig built in sharjah, assembled and commissioned in astrakhan commenced drilling in 2014 in turkmen sector of the caspian sea. Gustomsc, a dutch designer of offshore drilling rigs has revealed a new jackup rig design, the ng 3500x. The company designs and manufactures subsea, surface and rig equipment for use by oil and gas companies in offshore areas throughout the world. A jack up rig is typically used at a dozen or more sites during its service life. Seabed morphology mapping for jackup drilling rig emplacement. When determining the direction of setting up the rig, the prevailing wind direction should be considered so that substructure and engines can be set such that engine exhaust is carried away from the rig floor. Nov offset derrick, 160 ft h with 35 ft x 35 ft base and a 18 ft x 12 ft top.
The buoyant hull enables transportation of the unit and all attached machinery to a desired location. Once on location the hull is raised to the required elevation above the sea surface supported by the. Attached you can find the specs and all the information. The saturn jackup rig was acquired in 2011 from transocean. Multipledirectional wells are drilled from the platform by using a rig with a movable substructure. A comparison between onshore and offshore drilling rigs with proposed future developments technical report pdf available december 2014 with 17,661 reads how we.